Are the basement side rooms and bays (R2 to R9) open to the north hall?
The drawing shows them open, so the form measures them as one air volume with the loudspeaker in the hall. If any is closed off, each card gives the in-room figure.
The drawing shows them open, so the form measures them as one air volume with the loudspeaker in the hall. If any is closed off, each card gives the in-room figure.
It is the only corridor-like space on the drawing, about 20 m long and open at both ends.
The drawing does not show the ablution room. This is the only opening on that side.
About 5.9 m deep on the drawing. Laser shot L12 measures it; take it on a spare card if it is hall.
The drawing has no wall there, only a line and two round columns.
Do these before the acoustics: the model needs the heights before any reverberation time means anything. Each card shows where to put the laser and where to point it, with the drawing's value where there is one. The difference shows as you type: green within 15 cm, red past 50 cm.
Put the laser on the black square and aim along the red arrow. Drawing: 36.94 m, from the walls on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 36.94 m, from the walls on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 25.89 m, from the walls on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 25.91 m, from the walls on the drawing.
Stand on the red dot and aim straight up. Drawing: 9.20 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 10.21 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 20.80 m, the H label on the drawing. The drawing writes this 1.5 m from the centre and does not say what it measures to: apex, drum top or lantern. Note what the laser hits.
Stand on the red dot and aim straight up. No drawing value: this is what the visit adds. Stand just inside the dome's edge. Aim at the line where the flat ceiling or cornice meets the curve.
Put the laser on the black square and aim along the red arrow. Drawing: 2.68 m, from the walls on the drawing. Centre-to-centre spacing is this gap plus half of each column.
Put the laser on the black square and aim along the red arrow. Drawing: 28.01 m, from the walls on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 51.27 m, from the walls on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 5.35 m, from the walls on the drawing. This answers whether the strip is part of the hall: write what it is.
Stand on the red dot and aim straight up. Drawing: 5.00 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 4.53 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 4.00 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 10.86 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 5.80 m, the H label on the drawing.
The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.25 m, the door's width on the drawing.
The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.96 m, the door's width on the drawing.
The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.73 m, the door's width on the drawing.
The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.68 m, the door's width on the drawing.
The red ring marks the door. Laser across the opening, then floor to head. Drawing: 0.73 m, the door's width on the drawing.
The red ring marks the door. Laser across the opening, then floor to head. Drawing: 2.41 m, the door's width on the drawing.
The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.14 m, the door's width on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 37.49 m, from the walls on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 26.45 m, from the walls on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 28.03 m, from the walls on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 25.65 m, from the walls on the drawing.
Stand on the red dot and aim straight up. No drawing value: this is what the visit adds.
Stand on the red dot and aim straight up. No drawing value: this is what the visit adds.
Stand on the red dot and aim straight up. No drawing value: this is what the visit adds.
Stand on the red dot and aim straight up. No drawing value: this is what the visit adds.
Stand on the red dot at the rail and aim straight down through the void. No drawing value: this is what the visit adds. This one aims down, not up: hold the laser out over the void at the rail and shoot to the ground floor. Measure the rail's height above the mezzanine floor too, and subtract it.
Stand on the red dot and aim straight up. Drawing: 4.20 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 8.87 m, the H label on the drawing. Over the void, so this one is to the ceiling above the opening.
Stand on the red dot and aim straight up. Drawing: 4.20 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 4.75 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 4.76 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 4.38 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 3.45 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 5.00 m, the H label on the drawing.
Stand on the red dot and aim straight up. Drawing: 4.60 m, the H label on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 15.88 m, from the walls on the drawing.
Put the laser on the black square and aim along the red arrow. Drawing: 6.44 m, from the walls on the drawing.
Finishes, carpet, curtains, wall run and counts are still on the laser sheet.
Open the laser sheet| Zone | All off | AC towers only | Fans only | Normal running |
|---|---|---|---|---|
| Z1 | ||||
| Z1b | ||||
| Z4 | ||||
| Z3 | ||||
| Z3c | ||||
| Z2A | ||||
| Z2B | ||||
| Z2C | ||||
| Z5 | ||||
| Z7 | ||||
| Z6 | ||||
Tape the distance from the loudspeaker to the microphone, run one sweep, and compare with the distance REW reports. They should agree within about 0.2 m.
If they do not, stop and fix the timing reference before you continue. Only if it cannot be fixed today: RT still holds because it is a slope, but do not report C50 or D50, and say so here.
Type the grey name into the name box in REW, then the same name here. It says the zone, the station and the loudspeaker position.
Take 2 sweeps at each combination: 59 combinations, 118 sweeps for the whole list. For the second sweep add -2 to the name in REW; the card keeps the base name and the sweep count.
REW adds its own text around the name in its list. Leave that as it is.
No reverberation figures on this form. They are read afterwards from the REW file itself.
Where you choose the position: at least 1 m from any wall, 2 m from the other microphone positions, and 0.5 m clear of columns unless the card asks for a shadow.
Keep the peak between -12 and -6 dBFS, the same in every position where you can. Write it per zone.
Zones are listed in measuring order. If time runs short, the last zones wait; each zone has its own date and conditions for a second visit.
Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.
Keep the microphone at least 7.7 m from the loudspeaker in this zone. This is an estimate from before the measurement. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.
A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.
A column stands in the straight line from S1, S2 to this point: fine for T20 and T30, not for C50 or D50.
A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.
A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.
x runs from this block's own left wall, 4.58 m inside the main hall's. y runs from the row of eight columns.
The drawing shows about 5.9 m of walled space beyond the last column row. Confirm whether it is part of this hall. If it is, take it on a spare card.
Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.
Keep the microphone at least 6.9 m from the loudspeaker in this zone. This is an estimate from before the measurement. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.
A column stands in the straight line from S2 to this point: fine for T20 and T30, not for C50 or D50.
A column stands in the straight line from S2 to this point: fine for T20 and T30, not for C50 or D50.
Positions from the drawing's walls and columns. Front is the mihrab side.
Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.
Keep the microphone at least 5.9 m from the loudspeaker in this zone. This is an estimate from before the measurement. The floor area is from the drawing; the height behind this figure is a placeholder. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.
A column stands in the straight line from S2 to this point: fine for T20 and T30, not for C50 or D50.
A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.
The site notes say eight rooms and a corridor. The drawing shows the north hall, three side rooms and five bays opening off the hall, numbered here R1 to R9. Confirm the numbering and each room's use on site.
The loudspeaker moves with every room; each card shows where. Rooms 2 to 9 get one combination each: a spot check, below Survey grade (2 combinations). Where a room matters, add a second position on a spare card.
Keep the microphone at least 7.6 m from the loudspeaker in this zone. This is an estimate from before the measurement. Every room here is open to the north hall on the drawing, so they share its air: this minimum is for the hall, side rooms and bays together, 951.7 m² at the placeholder height of 3.0 m, with a placeholder RT, and the loudspeaker stands in the hall looking into each room. Each card gives its own room's minimum, for the case that the room turns out closed on site. If a station falls closer, move the loudspeaker further away and say so in the notes.
Loudspeaker: at the north hall's mihrab, 18.25 m from the left wall · 2.48 m from the front wall. Keep at least 7.6 m: the hall, its side rooms and bays share one air volume on the drawing. On the drawing the north hall is about 21.0 m front to back and 37.51 m across.
A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.
Loudspeaker: at the north hall's mihrab, 18.25 m from the left wall · 2.48 m from the front wall. Keep at least 7.6 m: the hall, its side rooms and bays share one air volume on the drawing. On the drawing the north hall is about 21.0 m front to back and 37.51 m across.
Loudspeaker: in the hall, looking into the room through its open side, 12.5 m from the left wall · 3.0 m from the front wall. Keep at least 7.6 m: the north-west room is open to the hall on the drawing, so it shares the hall's air. If the north-west room turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.9 m. On the drawing the north-west room is about 8.02 m front to back and 6.79 m across.
Loudspeaker: in the hall, looking into the room through its open side, 11.5 m from the left wall · 12.0 m from the front wall. Keep at least 7.6 m: the west room is open to the hall on the drawing, so it shares the hall's air. If the west room turns out closed off on site, put the loudspeaker inside it instead and keep at least 2.0 m. On the drawing the west room is about 9.52 m front to back and 6.55 m across.
Loudspeaker: in the hall, looking in through the room's open corner (the same spot as for bay 2), 12.18 m from the left wall · 10.47 m from the back wall. Keep at least 7.6 m: the south-west room is open to the hall only at its north-east corner on the drawing, so it shares the hall's air. If the south-west room turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.9 m. On the drawing the south-west room is about 8.26 m front to back and 7.13 m across.
Loudspeaker: in the hall, straight out from the bay, looking in, 8.56 m from the left wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 1 is open to the hall on the drawing, so it shares the hall's air. If the bay 1 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.1 m. On the drawing the bay 1 is about 5.47 m front to back and 3.26 m across.
Loudspeaker: in the hall, straight out from the bay, looking in, 12.18 m from the left wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 2 is open to the hall on the drawing, so it shares the hall's air. If the bay 2 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.2 m. On the drawing the bay 2 is about 5.47 m front to back and 3.69 m across.
Loudspeaker: in the hall, straight out from the bay, looking in, 16.56 m from the left wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 3 is open to the hall on the drawing, so it shares the hall's air. If the bay 3 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.3 m. On the drawing the bay 3 is about 5.47 m front to back and 4.76 m across.
Loudspeaker: in the hall, straight out from the bay, looking in, 16.12 m from the right wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 4 is open to the hall on the drawing, so it shares the hall's air. If the bay 4 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.3 m. On the drawing the bay 4 is about 5.47 m front to back and 4.61 m across.
Loudspeaker: in the hall, straight out from the bay, looking in, 10.25 m from the right wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 5 is open to the hall on the drawing, so it shares the hall's air. If the bay 5 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.5 m. On the drawing the bay 5 is about 5.47 m front to back and 6.81 m across.
The only corridor-like space on the drawing: a 2.9 m strip along the west side of the basement, with an opening in its outer wall. If the corridor is somewhere else, write the real positions in the notes.
Keep the microphone at least 0.8 m from the loudspeaker in this zone. This is an estimate from before the measurement. The corridor's volume in the model is a placeholder. If a station falls closer, move the loudspeaker further away and say so in the notes.
The sections as the walls show them: A is the central gallery around the void, B the strip along the west side, C the closed room. The register's 874.3 m² 'largest section' does not close on the drawing, so it is not used.
Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.
Keep the microphone at least 5.4 m from the loudspeaker in this zone. This is an estimate from before the measurement. This uses the register's 599.9 m² for the gallery and the lowest annotated height, 3.45 m, with a placeholder RT. Use more if the ceiling is higher. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.
A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.
The strip's outer side has no wall in the drawing, only a line and two round columns. Check whether it is open to the outside. The right wall here is the glazed wall of the gallery.
Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.
Keep the microphone at least 3.9 m from the loudspeaker in this zone. This is an estimate from before the measurement. This uses the area between the strip's lines on the drawing, 313.9 m², and the lowest annotated height, 3.45 m, with a placeholder RT. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.
Confirm on site whether this room belongs to the library.
Keep the microphone at least 2.2 m from the loudspeaker in this zone. This is an estimate from before the measurement. This uses the register's 98.1 m² for this room and the lowest annotated height, 3.45 m, with a placeholder RT. Use more if the ceiling is higher. If a station falls closer, move the loudspeaker further away and say so in the notes.
Positions from the drawing's walls; the far wall runs at an angle.
Keep the microphone at least 2.5 m from the loudspeaker in this zone. This is an estimate from before the measurement. This uses the drawn floor area, 119.0 m², with a placeholder height and RT. The rectangular room next to it may be part of the same suite; confirm on site. If a station falls closer, move the loudspeaker further away and say so in the notes.
No coordinates: the drawing does not bound this room. The basement corridor's outer wall has an opening, marked on the map; the ablution room is said to lie beyond the west wall. Write each position on site.
Keep the microphone at least 0.6 m from the loudspeaker in this zone. This is an estimate from before the measurement. The room size behind this figure is a placeholder, so use more if the room is bigger. If a station falls closer, move the loudspeaker further away and say so in the notes.
Candidate only: the red ring is an opening in the corridor's outer wall, the only one on that side. If the ablution door is somewhere else, note where.
Stand on the red dot and point the camera straight up.
Stand on the black dot and point the camera along the amber cone.
Stand on the black dot and point the camera along the amber cone.
Stand on the black dot and point the camera along the amber cone.
Stand on the black dot and point the camera along the amber cone.
Stand on the black dot and point the camera along the amber cone.
Stand on the black dot and point the camera along the amber cone.
Stand on the black dot and point the camera along the amber cone.
Stand on the black dot and point the camera along the amber cone.
Stand on the black dot and point the camera along the amber cone.
Stand on the black dot and point the camera along the amber cone.
Not on the drawing: write where you took it.
Not on the drawing: write where you took it.
Not on the drawing: write where you took it.
Not on the drawing: write where you took it.
Not on the drawing: write where you took it.
Not on the drawing: write where you took it.
Not on the drawing: write where you took it.
| # | Zone | Wall | x | y | z | Type | Model | Aim | Condition |
|---|---|---|---|---|---|---|---|---|---|
| SPK-01 | |||||||||
| SPK-02 | |||||||||
| SPK-03 | |||||||||
| SPK-04 | |||||||||
| SPK-05 | |||||||||
| SPK-06 | |||||||||
| SPK-07 | |||||||||
| SPK-08 | |||||||||
| SPK-09 | |||||||||
| SPK-10 | |||||||||
| SPK-11 | |||||||||
| SPK-12 |
| Zone | Clean SPL | At distance | STIPA | Keep or replace |
|---|---|---|---|---|
| Z1 | ||||
| Z1b | ||||
| Z4 | ||||
| Z3 | ||||
| Z3c | ||||
| Z2A | ||||
| Z2B | ||||
| Z2C | ||||
| Z5 | ||||
| Z7 |