REW field sheet, Masjid Al-Iman
AIM-PA-2026 · 46 stations · 59 source and microphone combinations

Order of the day: laser shots, then background noise, then the timing check, then the zones in the order listed. Photos whenever you pass the spot.
Every map is the client's own drawing. Black: walls and columns. Green: doors, as drawn, with no swing shown. Amber: windows. Blue dot: a microphone station, bigger for the one on that card. Red ring: a loudspeaker position. Black square and red arrow: where the laser sits and where it points. Red dot: stand here and aim up (one card, L30, says down and why). Amber cone: where the camera points. Front is the qibla side on every floor.
Works offline. Entries are saved on this device as you type, but a crash can lose the last few seconds. Export after each zone, and keep the file somewhere other than this phone. Import brings an export back onto any device.

Session

Questions to answer on site

The drawing cannot settle these. The red outline on each map shows where to look. Your answers save and export with the rest.

Are the basement side rooms and bays (R2 to R9) open to the north hall?

The drawing shows them open, so the form measures them as one air volume with the loudspeaker in the hall. If any is closed off, each card gives the in-room figure.

Is this 2.9 m strip along the basement's west side the corridor (Z3c)?

It is the only corridor-like space on the drawing, about 20 m long and open at both ends.

Is this opening in the corridor's outer wall the door to the ablution room (Z7)?

The drawing does not show the ablution room. This is the only opening on that side.

Is the walled strip past the expansion's last column row part of the hall?

About 5.9 m deep on the drawing. Laser shot L12 measures it; take it on a spare card if it is hall.

Is the mezzanine's west strip (Z2B) open to the outside on its outer side?

The drawing has no wall there, only a line and two round columns.

Laser shots, first

Do these before the acoustics: the model needs the heights before any reverberation time means anything. Each card shows where to put the laser and where to point it, with the drawing's value where there is one. The difference shows as you type: green within 15 cm, red past 50 cm.

Ground floor

L01 Main hall width, near the qibla wall

Put the laser on the black square and aim along the red arrow. Drawing: 36.94 m, from the walls on the drawing.

L02 Main hall width, ten metres before the column row

Put the laser on the black square and aim along the red arrow. Drawing: 36.94 m, from the walls on the drawing.

L03 Main hall depth, west: from the second column of the row to the qibla wall

Put the laser on the black square and aim along the red arrow. Drawing: 25.89 m, from the walls on the drawing.

L04 Main hall depth, east: from the seventh column of the row to the qibla wall

Put the laser on the black square and aim along the red arrow. Drawing: 25.91 m, from the walls on the drawing.

L05 Main hall height, west side

Stand on the red dot and aim straight up. Drawing: 9.20 m, the H label on the drawing.

L06 Main hall height, east side

Stand on the red dot and aim straight up. Drawing: 10.21 m, the H label on the drawing.

L07 Dome apex, straight up from the dome's centre

Stand on the red dot and aim straight up. Drawing: 20.80 m, the H label on the drawing. The drawing writes this 1.5 m from the centre and does not say what it measures to: apex, drum top or lantern. Note what the laser hits.

L08 Dome drum: up to where the curve begins

Stand on the red dot and aim straight up. No drawing value: this is what the visit adds. Stand just inside the dome's edge. Aim at the line where the flat ceiling or cornice meets the curve.

L09 Clear gap between the fourth and fifth columns of the row

Put the laser on the black square and aim along the red arrow. Drawing: 2.68 m, from the walls on the drawing. Centre-to-centre spacing is this gap plus half of each column.

L10 Expansion width, between the column rows

Put the laser on the black square and aim along the red arrow. Drawing: 28.01 m, from the walls on the drawing.

L11 Whole length: from the expansion's back wall to the qibla wall, through the column gaps

Put the laser on the black square and aim along the red arrow. Drawing: 51.27 m, from the walls on the drawing.

L12 The strip past the last column row: back wall to the column

Put the laser on the black square and aim along the red arrow. Drawing: 5.35 m, from the walls on the drawing. This answers whether the strip is part of the hall: write what it is.

L13 Expansion ceiling height, bay 1

Stand on the red dot and aim straight up. Drawing: 5.00 m, the H label on the drawing.

L14 Expansion ceiling height, bay 2

Stand on the red dot and aim straight up. Drawing: 4.53 m, the H label on the drawing.

L15 Expansion ceiling height, bay 3

Stand on the red dot and aim straight up. Drawing: 4.00 m, the H label on the drawing.

L16 Entrance hall height

Stand on the red dot and aim straight up. Drawing: 10.86 m, the H label on the drawing.

L17 Entrance lobby height

Stand on the red dot and aim straight up. Drawing: 5.80 m, the H label on the drawing.

D1 Door 1: width and height

The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.25 m, the door's width on the drawing.

D2 Door 2: width and height

The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.96 m, the door's width on the drawing.

D3 Door 3: width and height

The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.73 m, the door's width on the drawing.

D4 Door 4: width and height

The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.68 m, the door's width on the drawing.

D5 Door 5: width and height

The red ring marks the door. Laser across the opening, then floor to head. Drawing: 0.73 m, the door's width on the drawing.

D6 Door 6: width and height

The red ring marks the door. Laser across the opening, then floor to head. Drawing: 2.41 m, the door's width on the drawing.

D7 Door 7: width and height

The red ring marks the door. Laser across the opening, then floor to head. Drawing: 1.14 m, the door's width on the drawing.

Basement

L20 North hall width

Put the laser on the black square and aim along the red arrow. Drawing: 37.49 m, from the walls on the drawing.

L21 From the north wall to the back of bay 1

Put the laser on the black square and aim along the red arrow. Drawing: 26.45 m, from the walls on the drawing.

L22 Women's hall width, between the column rows

Put the laser on the black square and aim along the red arrow. Drawing: 28.03 m, from the walls on the drawing.

L23 Women's hall depth, along the right side

Put the laser on the black square and aim along the red arrow. Drawing: 25.65 m, from the walls on the drawing.

L24 Clear height, north hall

Stand on the red dot and aim straight up. No drawing value: this is what the visit adds.

L25 Clear height, a bay

Stand on the red dot and aim straight up. No drawing value: this is what the visit adds.

L26 Clear height, women's hall

Stand on the red dot and aim straight up. No drawing value: this is what the visit adds.

L27 Clear height, corridor

Stand on the red dot and aim straight up. No drawing value: this is what the visit adds.

Mezzanine

L30 Mezzanine floor level: from the void's rail straight down to the ground floor

Stand on the red dot at the rail and aim straight down through the void. No drawing value: this is what the visit adds. This one aims down, not up: hold the laser out over the void at the rail and shoot to the ground floor. Measure the rail's height above the mezzanine floor too, and subtract it.

L31 Mezzanine height where the drawing writes 4.20 m

Stand on the red dot and aim straight up. Drawing: 4.20 m, the H label on the drawing.

L32 Mezzanine height where the drawing writes 8.87 m

Stand on the red dot and aim straight up. Drawing: 8.87 m, the H label on the drawing. Over the void, so this one is to the ceiling above the opening.

L33 Mezzanine height where the drawing writes 4.20 m

Stand on the red dot and aim straight up. Drawing: 4.20 m, the H label on the drawing.

L34 Mezzanine height where the drawing writes 4.75 m

Stand on the red dot and aim straight up. Drawing: 4.75 m, the H label on the drawing.

L35 Mezzanine height where the drawing writes 4.76 m

Stand on the red dot and aim straight up. Drawing: 4.76 m, the H label on the drawing.

L36 Mezzanine height where the drawing writes 4.38 m

Stand on the red dot and aim straight up. Drawing: 4.38 m, the H label on the drawing.

L37 Mezzanine height where the drawing writes 3.45 m

Stand on the red dot and aim straight up. Drawing: 3.45 m, the H label on the drawing.

L38 Mezzanine height where the drawing writes 5.00 m

Stand on the red dot and aim straight up. Drawing: 5.00 m, the H label on the drawing.

L39 Mezzanine height where the drawing writes 4.60 m

Stand on the red dot and aim straight up. Drawing: 4.60 m, the H label on the drawing.

L40 Closed room length

Put the laser on the black square and aim along the red arrow. Drawing: 15.88 m, from the walls on the drawing.

L41 Closed room width

Put the laser on the black square and aim along the red arrow. Drawing: 6.44 m, from the walls on the drawing.

Finishes, carpet, curtains, wall run and counts are still on the laser sheet.

Open the laser sheet

Background noise, before any sweep

Capture this with the sound system off. Name each capture the way the grey text shows and save it in REW with its octave bands: NC is read from the file later, not typed here. Write the dBA reading under the name.
ZoneAll offAC towers onlyFans onlyNormal running
Z1
Z1b
Z4
Z3
Z3c
Z2A
Z2B
Z2C
Z5
Z7
Z6

Timing check, before the first measured sweep

Tape the distance from the loudspeaker to the microphone, run one sweep, and compare with the distance REW reports. They should agree within about 0.2 m.

If they do not, stop and fix the timing reference before you continue. Only if it cannot be fixed today: RT still holds because it is a slope, but do not report C50 or D50, and say so here.

If you come back on another day, repeat the check and the level calibration here. Each zone has its own date and conditions.

Naming and positions

Type the grey name into the name box in REW, then the same name here. It says the zone, the station and the loudspeaker position.

Take 2 sweeps at each combination: 59 combinations, 118 sweeps for the whole list. For the second sweep add -2 to the name in REW; the card keeps the base name and the sweep count.

REW adds its own text around the name in its list. Leave that as it is.

No reverberation figures on this form. They are read afterwards from the REW file itself.

Where you choose the position: at least 1 m from any wall, 2 m from the other microphone positions, and 0.5 m clear of columns unless the card asks for a shadow.

Keep the peak between -12 and -6 dBFS, the same in every position where you can. Write it per zone.

Zones are listed in measuring order. If time runs short, the last zones wait; each zone has its own date and conditions for a second visit.

In Z1, x runs from the wall on your left as you face the qibla, and y from the qibla wall. Z1b has its own x and y, given in its section. On the other floors each card gives the distance to the two nearest walls. Dashed circle on the ground floor: the dome.

Ground floor map: Z1, Z1b

QIBLAZ1Z1bS1S2G1G2G3G4G5G6G7G8G9SH1SH2MIHS1S2G1G2G3G4G5G65 m
Blue: measurement stations. Red ring: loudspeaker positions. Tap a station to open its card. On a phone, swipe the map sideways.

Z1 Main domed prayer hall0/12

Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.

Keep the microphone at least 7.7 m from the loudspeaker in this zone. This is an estimate from before the measurement. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.

S1 at the imam's position x 18.67 · y 2.0 mFrom here, measure: G1, G3, G4, G5, G6, G7, G8, G9, SH1, SH2
S2 rear of the hall, on the mihrab's line, in front of the column row x 18.67 · y 24.47 mFrom here, measure: G2, G4, G5, G6, MIH
Z1-G1front leftx 9.24 · y 6.62 m
Z1-G2front centrex 18.48 · y 6.62 m
Z1-G3front rightx 27.72 · y 6.62 m
Z1-G4middle leftx 9.24 · y 13.23 m

A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.

Z1-G5under the dome; also the focusing checkx 18.48 · y 13.23 m
Z1-G6middle rightx 27.72 · y 13.23 m

A column stands in the straight line from S1, S2 to this point: fine for T20 and T30, not for C50 or D50.

Z1-G7rear leftx 9.24 · y 19.85 m
Z1-G8rear centrex 18.48 · y 19.85 m
Z1-G9rear rightx 27.72 · y 19.85 m
Z1-SH1behind the left front dome pier, on the line from S1x 12.69 · y 9.71 m

A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.

Z1-SH2behind the right front dome pier, on the line from S1x 25.05 · y 9.67 m

A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.

Z1-MIHimam's position, 2 m from the qibla wallx 18.67 · y 2.0 m

Z1 Dome checks

From the measurement playbook. Do these while you are in the main hall.

Z1b Southern columned expansion0/6

x runs from this block's own left wall, 4.58 m inside the main hall's. y runs from the row of eight columns.

The drawing shows about 5.9 m of walled space beyond the last column row. Confirm whether it is part of this hall. If it is, take it on a spare card.

Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.

Keep the microphone at least 6.9 m from the loudspeaker in this zone. This is an estimate from before the measurement. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.

S1 middle of the front side, just behind the column row x 14.2 · y 2.5 mFrom here, measure: G1, G3, G4, G5, G6
S2 middle of the rear side, before the last column row x 14.2 · y 17.3 mFrom here, measure: G1, G2, G3
Z1b-G1front leftx 3.1 · y 3.3 m
Z1b-G2front, left of centrex 11.0 · y 4.2 m

A column stands in the straight line from S2 to this point: fine for T20 and T30, not for C50 or D50.

Z1b-G3front rightx 25.0 · y 3.3 m

A column stands in the straight line from S2 to this point: fine for T20 and T30, not for C50 or D50.

Z1b-G4rear leftx 3.1 · y 14.0 m
Z1b-G5rear centrex 14.2 · y 14.0 m
Z1b-G6rear rightx 25.0 · y 14.0 m

Basement map: Z4, Z3, Z3c

QIBLAZ4S1S2FLFRMCRLRRZ3R1AR1BR2R3R4R5R6R7R8R9Z3cS1C1C25 m
Blue: measurement stations. Red ring: loudspeaker positions. Tap a station to open its card. On a phone, swipe the map sideways.

Z4 Women's section0/5

Positions from the drawing's walls and columns. Front is the mihrab side.

Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.

Keep the microphone at least 5.9 m from the loudspeaker in this zone. This is an estimate from before the measurement. The floor area is from the drawing; the height behind this figure is a placeholder. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.

S1 at the women's hall mihrab, 2 m out 13.85 m from the left wall · 2.53 m from the front wallFrom here, measure: FL, FR, MC, RL, RR
S2 middle of the rear side 7.67 m from the left wall · 2.89 m from the back wallFrom here, measure: FL, FR, MC
Z4-FLfront left2.78 m from the left wall · 2.68 m from the front wall

A column stands in the straight line from S2 to this point: fine for T20 and T30, not for C50 or D50.

Z4-FRfront right2.97 m from the right wall · 2.68 m from the front wall
Z4-MCmiddle, in the central court13.88 m from the left wall · 12.92 m from the front wall
Z4-RLrear left2.57 m from the left wall · 3.19 m from the back wall

A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.

Z4-RRrear right3.77 m from the right wall · 3.19 m from the back wall

Z3 Basement, daily-prayer venue0/10

The site notes say eight rooms and a corridor. The drawing shows the north hall, three side rooms and five bays opening off the hall, numbered here R1 to R9. Confirm the numbering and each room's use on site.

The loudspeaker moves with every room; each card shows where. Rooms 2 to 9 get one combination each: a spot check, below Survey grade (2 combinations). Where a room matters, add a second position on a spare card.

Keep the microphone at least 7.6 m from the loudspeaker in this zone. This is an estimate from before the measurement. Every room here is open to the north hall on the drawing, so they share its air: this minimum is for the hall, side rooms and bays together, 951.7 m² at the placeholder height of 3.0 m, with a placeholder RT, and the loudspeaker stands in the hall looking into each room. Each card gives its own room's minimum, for the case that the room turns out closed on site. If a station falls closer, move the loudspeaker further away and say so in the notes.

S1 one per room, given on each card From here, measure: R1A, R1B, R2, R3, R4, R5, R6, R7, R8, R9
Z3-R1Anorth hall, front left9.5 m from the left wall · 6.0 m from the front wall

Loudspeaker: at the north hall's mihrab, 18.25 m from the left wall · 2.48 m from the front wall. Keep at least 7.6 m: the hall, its side rooms and bays share one air volume on the drawing. On the drawing the north hall is about 21.0 m front to back and 37.51 m across.

Z3-R1Bnorth hall, right side6.01 m from the right wall · 11.04 m from the front wall

A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.

Loudspeaker: at the north hall's mihrab, 18.25 m from the left wall · 2.48 m from the front wall. Keep at least 7.6 m: the hall, its side rooms and bays share one air volume on the drawing. On the drawing the north hall is about 21.0 m front to back and 37.51 m across.

Z3-R2north-west room, middle3.4 m from the left wall · 3.42 m from the back wall

Loudspeaker: in the hall, looking into the room through its open side, 12.5 m from the left wall · 3.0 m from the front wall. Keep at least 7.6 m: the north-west room is open to the hall on the drawing, so it shares the hall's air. If the north-west room turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.9 m. On the drawing the north-west room is about 8.02 m front to back and 6.79 m across.

Z3-R3west room, rear half3.3 m from the left wall · 4.33 m from the front wall

Loudspeaker: in the hall, looking into the room through its open side, 11.5 m from the left wall · 12.0 m from the front wall. Keep at least 7.6 m: the west room is open to the hall on the drawing, so it shares the hall's air. If the west room turns out closed off on site, put the loudspeaker inside it instead and keep at least 2.0 m. On the drawing the west room is about 9.52 m front to back and 6.55 m across.

Z3-R4south-west room, front half4.35 m from the left wall · 2.86 m from the front wall

Loudspeaker: in the hall, looking in through the room's open corner (the same spot as for bay 2), 12.18 m from the left wall · 10.47 m from the back wall. Keep at least 7.6 m: the south-west room is open to the hall only at its north-east corner on the drawing, so it shares the hall's air. If the south-west room turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.9 m. On the drawing the south-west room is about 8.26 m front to back and 7.13 m across.

Z3-R5bay 1, near the back wall1.63 m from the right wall · 1.17 m from the back wall

Loudspeaker: in the hall, straight out from the bay, looking in, 8.56 m from the left wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 1 is open to the hall on the drawing, so it shares the hall's air. If the bay 1 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.1 m. On the drawing the bay 1 is about 5.47 m front to back and 3.26 m across.

Z3-R6bay 2, near the back wall1.84 m from the left wall · 1.17 m from the back wall

Loudspeaker: in the hall, straight out from the bay, looking in, 12.18 m from the left wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 2 is open to the hall on the drawing, so it shares the hall's air. If the bay 2 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.2 m. On the drawing the bay 2 is about 5.47 m front to back and 3.69 m across.

Z3-R7bay 3, near the back wall2.38 m from the left wall · 1.17 m from the back wall

Loudspeaker: in the hall, straight out from the bay, looking in, 16.56 m from the left wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 3 is open to the hall on the drawing, so it shares the hall's air. If the bay 3 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.3 m. On the drawing the bay 3 is about 5.47 m front to back and 4.76 m across.

Z3-R8bay 4, near the back wall2.3 m from the left wall · 1.17 m from the back wall

Loudspeaker: in the hall, straight out from the bay, looking in, 16.12 m from the right wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 4 is open to the hall on the drawing, so it shares the hall's air. If the bay 4 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.3 m. On the drawing the bay 4 is about 5.47 m front to back and 4.61 m across.

Z3-R9bay 5, near the back wall3.4 m from the right wall · 1.17 m from the back wall

Loudspeaker: in the hall, straight out from the bay, looking in, 10.25 m from the right wall · 10.47 m from the back wall. Keep at least 7.6 m: the bay 5 is open to the hall on the drawing, so it shares the hall's air. If the bay 5 turns out closed off on site, put the loudspeaker inside it instead and keep at least 1.5 m. On the drawing the bay 5 is about 5.47 m front to back and 6.81 m across.

Z3c Basement corridor0/2

The only corridor-like space on the drawing: a 2.9 m strip along the west side of the basement, with an opening in its outer wall. If the corridor is somewhere else, write the real positions in the notes.

Keep the microphone at least 0.8 m from the loudspeaker in this zone. This is an estimate from before the measurement. The corridor's volume in the model is a placeholder. If a station falls closer, move the loudspeaker further away and say so in the notes.

S1 at the north end of the corridor, facing along it 1.45 m from the right wallFrom here, measure: C1, C2
Z3c-C1corridor, north half1.45 m from the right wall
Z3c-C2corridor, south half1.1 m from the right wall

Mezzanine map: Z2A, Z2B, Z2C, Z5

QIBLAZ2AS1S2A1A2A3Z2BS1S2B1B2Z2CS1C1C2Z5S1M1M25 m
Blue: measurement stations. Red ring: loudspeaker positions. Tap a station to open its card. On a phone, swipe the map sideways.

Z2A Mezzanine, central gallery0/3

The sections as the walls show them: A is the central gallery around the void, B the strip along the west side, C the closed room. The register's 874.3 m² 'largest section' does not close on the drawing, so it is not used.

Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.

Keep the microphone at least 5.4 m from the loudspeaker in this zone. This is an estimate from before the measurement. This uses the register's 599.9 m² for the gallery and the lowest annotated height, 3.45 m, with a placeholder RT. Use more if the ceiling is higher. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.

S1 middle of the front side 12.45 m from the right wall · 2.0 m from the front wallFrom here, measure: A1, A2, A3
S2 rear side, beside the closed room 11.15 m from the left wall · 1.66 m from the back wallFrom here, measure: A1, A2, A3
Z2A-A1west aisle, front3.35 m from the left wall · 4.1 m from the front wall
Z2A-A2west aisle, rear3.35 m from the left wall · 5.46 m from the back wall
Z2A-A3east aisle, middle2.67 m from the right wall · 12.2 m from the back wall

A column stands in the straight line from S1 to this point: fine for T20 and T30, not for C50 or D50.

Z2B Mezzanine, west strip0/2

The strip's outer side has no wall in the drawing, only a line and two round columns. Check whether it is open to the outside. The right wall here is the glazed wall of the gallery.

Take every S1 sweep in this zone, then move the loudspeaker to S2 for the rest.

Keep the microphone at least 3.9 m from the loudspeaker in this zone. This is an estimate from before the measurement. This uses the area between the strip's lines on the drawing, 313.9 m², and the lowest annotated height, 3.45 m, with a placeholder RT. If a station falls closer, measure it from the other loudspeaker position and say so in the notes.

S1 front end of the strip 4.2 m from the right wall · 2.84 m from the front wallFrom here, measure: B1, B2
S2 rear end of the strip 4.2 m from the right wall · 2.71 m from the back wallFrom here, measure: B1, B2
Z2B-B1front half of the strip4.2 m from the right wall · 9.84 m from the front wall
Z2B-B2rear half of the strip4.2 m from the right wall · 9.71 m from the back wall

Z2C Mezzanine, closed room0/2

Confirm on site whether this room belongs to the library.

Keep the microphone at least 2.2 m from the loudspeaker in this zone. This is an estimate from before the measurement. This uses the register's 98.1 m² for this room and the lowest annotated height, 3.45 m, with a placeholder RT. Use more if the ceiling is higher. If a station falls closer, move the loudspeaker further away and say so in the notes.

S1 against the left wall, facing along the room 1.3 m from the left wall · 3.19 m from the front wallFrom here, measure: C1, C2
Z2C-C1left half of the room4.5 m from the left wall · 3.19 m from the front wall
Z2C-C2right half of the room3.9 m from the right wall · 3.19 m from the front wall

Z5 Library / lesson hall0/2

Positions from the drawing's walls; the far wall runs at an angle.

Keep the microphone at least 2.5 m from the loudspeaker in this zone. This is an estimate from before the measurement. This uses the drawn floor area, 119.0 m², with a placeholder height and RT. The rectangular room next to it may be part of the same suite; confirm on site. If a station falls closer, move the loudspeaker further away and say so in the notes.

S1 near the left wall, facing into the room 1.14 m from the left wall · 1.48 m from the front wallFrom here, measure: M1, M2
Z5-M1left part of the library4.24 m from the left wall · 2.48 m from the front wall
Z5-M2right part of the library6.15 m from the right wall · 1.88 m from the front wall

Z7 Ablution0/2

No coordinates: the drawing does not bound this room. The basement corridor's outer wall has an opening, marked on the map; the ablution room is said to lie beyond the west wall. Write each position on site.

Keep the microphone at least 0.6 m from the loudspeaker in this zone. This is an estimate from before the measurement. The room size behind this figure is a placeholder, so use more if the room is bigger. If a station falls closer, move the loudspeaker further away and say so in the notes.

Candidate only: the red ring is an opening in the corridor's outer wall, the only one on that side. If the ablution door is somewhere else, note where.

S1 inside the room, facing the room From here, measure: M1, M2
Z7-M1first point in the room
Z7-M2second point in the room

Photos

Each mapped photo shows where to stand and which way to point. The rest are not on the drawing: write where you took them.

P01 Dome apex, from directly below

Stand on the red dot and point the camera straight up.

P02 The whole dome profile, from across the hall

Stand on the black dot and point the camera along the amber cone.

P03 The mihrab: tap it first, marble or painted gypsum

Stand on the black dot and point the camera along the amber cone.

P04 Expansion west wall: bare blockwork, finished or not

Stand on the black dot and point the camera along the amber cone.

P05 A typical main hall window, with its sill

Stand on the black dot and point the camera along the amber cone.

P06 Basement north hall, wide

Stand on the black dot and point the camera along the amber cone.

P07 The bays, from the hall: as many shots as it takes to show all five

Stand on the black dot and point the camera along the amber cone.

P08 Women's hall, end to end

Stand on the black dot and point the camera along the amber cone.

P09 Mezzanine gallery, wide

Stand on the black dot and point the camera along the amber cone.

P10 The closed room

Stand on the black dot and point the camera along the amber cone.

P11 The library

Stand on the black dot and point the camera along the amber cone.

P20 Dome drum, straight up from the gallery rail (the rail is not on the drawing)

Not on the drawing: write where you took it.

P21 Women's section: the conduit where audio shares power

Not on the drawing: write where you took it.

P22 Every amplifier and mixer, model plate readable

Not on the drawing: write where you took it.

P23 A typical speaker of each kind, with its label

Not on the drawing: write where you took it.

P24 AC units and fans in each hall

Not on the drawing: write where you took it.

P25 The minaret from outside, its platform, and what it overlooks

Not on the drawing: write where you took it.

P26 The mezzanine's edge over the main hall: open or enclosed

Not on the drawing: write where you took it.

Spare stations, for anything the list did not foresee

Worth taking one near an air outlet, in any zone where it is easy.
X1
X2
X3
X4
X5
X6

Existing PA

Photograph the model plate of every box, and position every box.
#ZoneWallxyzTypeModelAimCondition
SPK-01
SPK-02
SPK-03
SPK-04
SPK-05
SPK-06
SPK-07
SPK-08
SPK-09
SPK-10
SPK-11
SPK-12
Through the installed system, per zone, if you can run it: the highest clean level and the distance it was read at, STIPA if an analyser is here, and your impression on keeping it.
ZoneClean SPLAt distanceSTIPAKeep or replace
Z1
Z1b
Z4
Z3
Z3c
Z2A
Z2B
Z2C
Z5
Z7

Before leaving